All of the work was focused on 39 Central Sq. last week, but today we started transforming the hallway of 37 Central Sq. in order to prep for the wall between the two space to be demolished.Before anything else could happen, the drop ceiling in the hallway needed to be taken down.
Back on the 39 Central Sq. side, we got a bit of a surprise. While taking down the drywall from the back of the space, we discovered there was a concrete wall behind it.
Hmmm... but what was behind the mystery wall. MYSTERY STAIRS!

These were metal stairs from the original building. There must've been some other renovations where a staircase was taken out from the 2nd, 3rd & 4th floors of the building.

Mystery stairway to heaven?